Summer 2006 Projects

From SlugWiki
Revision as of 03:13, 29 May 2006 by Rob (Talk) (Sunday May 28)

Jump to: navigation, search

The summer 2006 term is set to be one of the busiest and most productive period of time for slugs to engage in various projects.

Sunday May 28

File:4enetwork.jpg
The current layout of the 4e network.

Rob Crowell completed configuring the gateway for the slugfest internal network. Rob and Walker laid cables in the cable trays to the Cocoa Lounge, as well as Rob's current room, Walker's current room (and Rob's future room), and Walker's future room. The set of Monsoon speakers that Edwin Chen got from reuse was installed in the Kitchen as well.